Internals

Gallery Of Work

PLOT 7 LONDON

CLIENT: More London Developments

ARCHITECT: Foster and Partners

VALUE: £ 0.65m (2009)

Design, supply and installation of 1600m2 of Bianco Lorarno Italian marble on two levels on sand/cement bed incorporating under floor heating.

Upper level (podium) on a raised floor built on pedestals.

 

Tags: Hard landscaping, façade cleaning, Traditional handset rain screen, Panelised cladding, Load bearing masonry, Raised flooring systems, New build masonry .